EFES PILSEN ADANA BEER FACTORY

EFES PILSEN ADANA BEER FACTORY

Quota

FERMENTATION CONTROL SYSTEM (1989):

In this project, fermentation control system is designed and installed for the Efes Pilsen Beer Factory, using Elimko PLC and PC System.

FLOATATION TANKS CONTROL SYSTEM (1994):

In this project, floatation tanks control system is designed and installed for the Efes Pilsen Beer Factory, using Elimko PLC System.

PASTEURISETION AUTOMATION (1994):

In this project, pasteurisation system automation is done by Elimko, using Elimko PLC System.