EFES PILSEN ADANA BEER FACTORY
FERMENTATION CONTROL SYSTEM (1989):
In this project, fermentation control system is designed and installed for the Efes Pilsen Beer Factory, using Elimko PLC and PC System.
FLOATATION TANKS CONTROL SYSTEM (1994):
In this project, floatation tanks control system is designed and installed for the Efes Pilsen Beer Factory, using Elimko PLC System.
PASTEURISETION AUTOMATION (1994):
In this project, pasteurisation system automation is done by Elimko, using Elimko PLC System.