CINKUR ZINC FACTORY

CINKUR ZINC FACTORY

Quota

LEAD REGAINING PLANT AUTOMATION SYSTEM (1997):

In this project, a batching plant is build to regain lead from zinc productionprocess outlets. Automation system is designed and installed with Elimko PLC System.

ZINC ELECTROLYZE POOLS AUTOMATION SYSTEM (1998):

In this project, weighing and transferring of raw material and additives into the electrolyze pools and PH control of the pools are done by Elimko.

Automation system is designed and installed with Elimko PLC System.

Elimko dosing belts and batch weighing units are used.