ASKALE CEMENT FACTORY

ASKALE CEMENT FACTORY

Quota

CEMENT MILL DOSING BELTS (1999):

At the Aþkale Cement Factory, cement mill dosing belts are replaced with Elimko Dosing Belts. Coordination of Dosing Belts are provided with Elimko PLC System.

KILN FEEDING SYSTEM MODERNISATION (1999):

At the Aþkale Cement Factory, kiln feeding dosing belt is renewed by Elimko System and its capacity is increased 50 %.

CEMENT MILL FILLING CONTROL  (2000):

Aþkale Cement Factory cement mill filling system is done by Elimko to provide optimal production, using Elimko Electronic Ear and PLC System.