ANADOLU GLASS FACTORY
BATCHING PLANT AUTOMATION (1990):
In this project, the complete automation of the raw material preparation plant is provided by Elimko using Elimko PLC System and PC Software.
This plant serves the 4 glass furnaces with total capacity 550 tons/day.
Old mechanical scales are taken out and new electronic batching scales are installed with load cell.
BATCHING PLANT AUTOMATION MODERNISATION AND ADDING 2 MORE LINES (1997):
Batching plant automation system was renewed and 2 batching lines were added in 1997 also PC and the PC Software is renewed.